Today we completed an asphalt concrete edge repair at a commercial property in Wangara to improve the transition from the asphalt outside the roller door to the concrete inside. The existing edge had a big enough height difference to cause a bumpy problem for the forklift operations moving in and out of the building.
As you can see from the before and after pictures the difference doesn’t look like much, but when you have a forklift loaded with 500kg or more of stock and hard small tyres driving over the bump it is very noticeable to the operator.
Thanks to our technician Klaid for a job well done and thanks to our friends at Agora Property Group for engaging us to do the work! A very good outcome for the forklift driver!
For information on Agora Property Group and the great service they provide please visit their website – Agora Property Group
Before & After